Master Plan

Protected forest & reef preserves 2 luxury overwater hotel sites Floating bungalows hotel site Treehouse Villas hotel site Multiple residential sites Deepwater marina site Commercial sites
The Tai Nuare Master Plan 
May 2022 CBRE Land Appraisal

Section A

This section is the community center of all Tai Nuare

  • The Event Center
  • Community Pool
  • Restaurant
  • Wellness Center
  • Gym
  • General Store
  • Indigenous Vendors Area
  • Juice Bar
  • The Cliff Walk
  • Environmental Research Center
Group & Landscaping

Regulations, Restrictions, Zoning, Financial Responsibilities

Section B

This section is a group of 28 lots, beach and lake

Phase 1 lots

Solar panels to cover walkways and used for water catchment. Sewer tanks and leach lines to be buried. 

Regulations, Restrictions, Zoning, Financial Responsibilities

Section C

This section is a overwater villa hotel site. 44-55 units

Self sustaining principles

All power generation by wind or solar. Overwater Units: Solar panels to be placed over docks for shade and water catchment. Water storage/
sewer tanks to be placed under docks at private-public docks connection points, wind turbines above solar panels.  Treated sewer water to be used to water dock planters        

Regulations, Restrictions, Zoning, Financial Responsibilities

Section D

This section is a group of 18 lots

Solar panels to cover walkways and used for water catchment. Sewer tanks and leach lines to be buried. 

Regulations, Restrictions, Zoning, Financial Responsibilities

Section E

This section is a group of 50 lots

Solar panels to cover walkways and used for water catchment. Sewer tanks and leach lines to be buried. 

Regulations, Restrictions, Zoning, Financial Responsibilities

Section F

This section is the deep water marina

80-150 Marina slips. All power generation by wind or solar. Overwater Units: Solar panels to be placed over docks for shade and water catchment. Water storage/ sewer tanks to be placed under docks at private-public docks connection points, wind turbines above solar panels.

Regulations, Restrictions, Zoning, Financial Responsibilities

Section G

This section is a group of an undetermined number of lots lots

80-150 Marina slips

Regulations, Restrictions, Zoning, Financial Responsibilities

Section G

This section is a Treehouse Resort Site 

20-30 units

Regulations, Restrictions, Zoning, Financial Responsibilities

Section H

This section is for a marina expansion or floating bungalows

Regulations, Restrictions, Zoning, Financial Responsibilities

Section I

This section is a overwater villa hotel site. 28-50 units

Self sustaining principles

All power generation by wind or solar. Overwater Units: Solar panels to be placed over docks for shade and water catchment. Water storage/
sewer tanks to be placed under docks at private-public docks connection points, wind turbines above solar panels. Treated sewer water to be used to water dock planters        

Regulations, Restrictions, Zoning, Financial Responsibilities

Section K

This section is a mountain with a teak plantation

Teak Mountain Water Rights

Has over 5000 mature teak trees ready for harvest and use for construction in the project.

Teak Mountain Water Rights

North spring

Lorem ipsum dolor sit, amet consectetur adipisicing clit
adipisicing elit. Lorem ipsum dolor sit, amet consectetur

West spring

Lorem ipsum dolor sit, amet consectetur adipisicing clit
adipisicing elit. Lorem ipsum dolor sit, amet consectetur

Permaculture & section J rights & responsibilities

Northwest spring

Lorem ipsum dolor sit, amet consectetur adipisicing clit
adipisicing elit. Lorem ipsum dolor sit, amet consectetur

South spring

Lorem ipsum dolor sit, amet consectetur adipisicing clit
adipisicing elit. Lorem ipsum dolor sit, amet consectetur

TNL receive 15% food revenue for land contribution

Regulations, Restrictions, Zoning, Financial Responsibilities

Section J

This section is a overwater residential villas site. 20-30 units

All power generation by wind or solar. Overwater Units: Solar panels to be placed over docks for shade and water catchment. Water storage/
sewer tanks to be placed under docks at private-public docks connection points, wind turbines above solar panels. Treated sewer water to be used to water dock planters                                  

Regulations, Restrictions, Zoning, Financial Responsibilities

Reserve Sections

Lorem ipsum dolor sit, amet consectetur adipisicing clit adipisicing elit. Lorem ipsum dolor sit, amet consectetur Lorem ipsum dolor sit, amet
consectetur adipisicing clit adipisicing elit. Lorem ipsum dolor sit, amet consectetur Lorem ipsum dolor sit, amet consectetur adipisicing clit
adipisicing elit. Lorem ipsum dolor sit, amet consectetur
Reserve Sections
Reserve Sections
Reserve Sections